Fusion Students Swansea
Back to Projects

Fusion Students Swansea

Swansea

Main contractor
ISG Construction Ltd
Client
Fusion Students Ltd
Value
£5m
Scope
17 storey concrete frame and 2 storey transfer podium slab; tower cranes supply/operate
Midwest Precast
Designed/manufactured/supplied PCC vertical elements – 2 stair cores and double lift shafts, columns, shear walls and staircases
Plant
Floor protection screens supply/operate; tower cranes x 2 supply/operate
Engineer
Shear Design Ltd

Fusion Students appointed Midwest to deliver the reinforced concrete frame for this purpose-built student accommodation scheme in Swansea. Developments of this type are built around repeating cellular room layouts stacked above shared amenity space, a configuration that rewards a subcontractor able to hold consistent quality across a high volume of near-identical bays.

The Package

Midwest’s scope covered the full RC frame: erecting formwork to the engineer’s design, fixing reinforcement, and placing and curing concrete floor by floor in line with the main contractor’s release programme. Each level was struck and handed over in sequence so that partitioning, first-fix M&E, and the building envelope could follow close behind the frame, keeping the wider programme moving.

For Fusion Students, the brief was straightforward: a frame contractor capable of repeating that cycle accurately, level after level, without the setting-out drifting as the building rose.

Ready to discuss your next project?

Contact Us
CHAS Elite
ISO 9001
ISO 45001
SafeContractor